Mangere West Network Reinforcement Project

Island Rd to Oruarangi Rd, Mangere West

Prove 590m x 140mm duct installed by others

Excavate entry/exit/expose existing services holes

Directional drill 3,000m+ x 2 x 140mm PE pipes

Traffic and Pedestrian Management to enable all of the above works